Geda 500Z/ZP
Transport Platform
The Geda 500 Z/ZP has two separate control systems and can be used either as a material hoist only or as a transport platform for passengers and materials.
The transport platform control with a speed of 12 m/min is activated for transporting passengers and materials. For transporting construction materials only, the device is switched to the material hoist mode with a lifting speed of 24 m/min.
Particularly in favour with Scaffolding contractors, the single-mast Geda 500 Z/ZP transport platform can also be converted to transport scaffold tubes, boards and fittings safely & efficiently when the renowned ‘Lock ‘n Load’ system is fitted.
Spec Sheet Geda 500ZZP LHM
Spec Sheet Geda 500ZZP RHM
Geda 500Z/ZP SL
Transport Platform
The Geda 500 Z/ZP SL has two separate control systems and can be used either as a material hoist only or as a transport platform for passengers and materials.
The transport platform control with a speed of 12 m/min is activated for transporting passengers and materials. For transporting construction materials only, the device is switched to the material hoist mode with a lifting speed of 24 m/min.
Particularly useful when site constraints dictate unusual footprint availability, the single-mast Geda 500 Z/ZP SL transport platform can provide the ability to transport sheet material in its large platform.
Spec Sheet Geda 500ZZP SL LHM
Spec Sheet Geda 500ZZP SL RHM
Maber MBC1000
Transport Platform
The MBC1000 has two separate control systems and can be used either as a material hoist only or as a transport platform for passengers and materials.
The transport platform control with a speed of 12 m/min is activated for transporting passengers (max 5 persons including operator) and materials. For transporting construction materials only, the device is switched to the material hoist mode with a lifting speed of 24 m/min.
Supplied with Electrically & Mechanically interlocking Landing gates, this single-mast MBC1000 transport platform is a robust and reliable option for all trades and applications.
Spec Sheet Maber MBC1000 LHM 4218 & 4248
Spec Sheet Maber MBC1000 LHM 2103003 onwards
Spec Sheet Maber MBC1000 RHM 4218 & 4248
Spec Sheet Maber MBC1000 RHM 2103003 onwards
Maber MBC2000 - 1500kg
Transport Platform
The MBC2000 has two separate control systems and can be used either as a material hoist only or as a transport platform for passengers and materials.
The transport platform control with a speed of 12 m/min is activated for transporting passengers (max 8 persons including operator) and materials. For transporting construction materials only, the device is switched to the material hoist mode with a lifting speed of 24 m/min.
Supplied with Electrically & Mechanically interlocking Landing gates, this single-mast MBC2000 transport platform is a robust, large, and very reliable option for all trades and applications.
Spec Sheet Maber MBC2000 1500KG 3515 LHM
Spec Sheet Maber MBC2000 1500KG 3515 RHM
Maber MBC2000 - 2000kg
Transport Platform
The MBC2000 has two separate control systems and can be used either as a material hoist only or as a transport platform for passengers and materials.
The transport platform control with a speed of 12 m/min is activated for transporting passengers (max 8 persons including operator) and materials. For transporting construction materials only, the device is switched to the material hoist mode with a lifting speed of 24 m/min.
Supplied with Electrically & Mechanically interlocking Landing gates, this single-mast MBC2000 transport platform is a robust, large, and very reliable option for all trades and applications.
Spec Sheet Maber MBC2000 3509 LHM
Spec Sheet Maber MBC2000 3509 RHM
Spec Sheet Maber MBC2000 5003 LHM
Spec Sheet Maber MBC2000 5003 RHM
Geda 1500Z/ZP
Transport PLatform
The Geda 1500 Z/ZP has two separate control systems and can be used either as a material hoist only or as a transport platform for passengers and materials.
The transport platform control with a speed of 12 m/min is activated for transporting passengers and materials. For transporting construction materials only, the device is switched to the material hoist mode with a lifting speed of 24 m/min.
One device, numerous possibilities: the double-mast Geda 1500 Z/ZP transport platform ideally adapts to virtually any conditions on site thanks to the convenient modular system with different platform versions and different load
capacities.
The large loading platform variants of the Geda 1500 Z/ZP offer plenty of space – even for transporting particularly heavy and bulky materials such as full pallets of plasterboard.
Despite high load capacities of up to 2000 kg, the proven double mast system ensures significantly reduced tie loadings applied to the securing structure compared to single mast Hoists.
Spec Sheet Geda 1500ZZP