Our range of smaller hoists often find themselves playing a key role in medium size projects, delivering goods at upper landing levels reliably for our clients on a regular basis.
This fine example is a GEDA GmbH 300Z Materials Hoist configured near to the Bristol docks, not far from the infamous SS Great Britain.
Transporting a wide range of goods for the external works on this project, it is serving 8 landings, ensuring the operatives get up to 300kg per trip of what they need, when they need it.
Another fine installation configured by our Bristol team.