Considered Positioning

Sometimes, our equipment is required in places which require a little thought and some careful planning on how to get them there.

On this recent example in Bristol’s busy Cabot Circus shopping centre, our Installers were on site bright and early to oversee the unloading and subsequent wheeling of a GEDA GmbH 1500z/zp down through the mall and into position.

There is no time to waste on projects like these, so planning has to be both meticulous and effective in order to get the job done before the public arrive in their droves.

As always, our exceptional Installers executed the safe system of works to perfection. Another exemplary job.