We currently have a goods Hoist grafting away at an Energy Recovery Facility in Chester.
The GEDA GmbH 1500z/zp is configured to ‘BS platform’ specifically to suit the complex project requirements and the available footprint. As always, we offer bespoke solutions to our valued clients, enabling maximum suitability.
With a 2000kg safe working load and an ample 3.3m x 1.45m available platform area, there’s not much that can’t be taken care of with this versatile machine.
Expertly installed by our excellent Midlands team, this reliable Hoist will play a key role in raising and lowering materials safely.