Accessories

Scaffold Carriers (Lok'N'Load)

Here at Hoist Hire, we are often amazed that we still see scaffolders pulling up their tubes and fittings via a Gin Wheel and rope. Besides the Safety element of this dated method, it involves unnecessary strenuous manual handling, and is far slower in terms of progression of a scaffold erection project.

Those who have used our Scaffolding Transportation systems are quite simply sold on them. The easy (vertical) loading, securing, and unloading of long tubes, boards, and containers of fittings really does transform a scaffold erection programme.

Our ‘Lok n Load’ systems can transport up to 40 x long tubes and 24 x 13ft boards in one Hoist and in just one trip!

We have a range of Hoists which provide this function with capacities up to 2000kg. This broad range means you can transform scaffold erection whether it is a small, medium or large project.

Scaffold carrying Hoists can be installed at the early stages of the scaffold configuration, and progressively extended to keep in touch with the top lift. Upon scaffold completion, the Hoists can be converted for use by the Principle Contractor as Good Hoists or Transport Platforms.

Put simply, utilising our Hoists means much safer, far more efficient, and far quicker scaffold erection.

Scaff 1
Scaff 2
Scaff 3
Scaff 5